- Lower LCOE (for the same land area, ABC vs. TOPCon)
- For the same area, the power generation is 7%+ higher than TOPCon and 15%+ higher than PERC.
- The BOS cost per watt is 5%+ lower than TOPCon and 10% lower than PERC.
- Lower O&M cost High temperature restriction and micro-crack resistance, front grid free, ensuring roof safety, reducing module failure rate. The same DC capacity with connection points reduced by about 5.5%.
- For the same installed capacity, a 100MW PV power station reduces the land occupation of 24500m².
- Greater installed capacity for the same land area, e.g. 5.8 MW greater for 100 MW PV power station (Note: With the same product dimensions)